Name : HOW POOI HAN
Date of Birth : November 23, 1959
Present Position : Director – Operations
EXPERIENCE :
Mar. ‘83 – Jun. ‘91
Surveyor
Pilecon Engineering Sdn. Bhd.
Responsible for setting out and as built surveys for various driven piles, bored
piles, caissons, micropiles, ground anchors, and diaphragm walls construction
projects.
July ‘91 – Aug. ‘95
Executive Supervisor cum Surveyor
Bachy Soletanche (M) Sdn. Bhd.
Surveyed and supervised various construction projects including:
- Diaphragm wall, anchors, and micropiling works at Jln. Sultan for UDA, K.L.
- Ground anchors and pressure grouting works at Wisma Genting, K.L.
- Anchored caissons retaining walls for Resort Hotel & Car Park 4, Genting Highlands
- Micropiling works for Outdoor Theme Park project in Genting Highlands
- Caissons foundation for RSC 5 Staff Quarters, Genting Highlands
- Caissons foundation for the new Sewerage Treatment Plant, Genting Highlands
- Underpinning works for Cable Car Tower 4, Genting Highlands
- Pressure grouting works at RSC 2 Staff Quarters, Car Park 1, Genting Road 4.1KM
and 4.9KM, Pump House 1, 2 and 3, Valley Wing Hotel, Theme Park Hotel, Chin
Swee Temple, etc. for Resorts World Bhd. at Genting Highlands
Sep. 95 – Jul. ‘96
Director
Alpha Geotechnique Sdn. Bhd
Coordinated and managed the following construction projects:
- Caissons, bored piles and gunite wall for Menara Lagenda, Kuala Lumpur
- Slope Remedial works at Villa Genting Amber Court Apartment, Genting Highlands
- Piling works for the Gohtong Jaya Apartments at Genting Highlands
- Slope remedial works at CH27.200, Jalan Gunung Raya, Pulau Langkawi, Kedah
- Caissons, pilecaps, and plinths for Skyway Cable Car System, Genting Highlands
- Caisson foundation for STAR LRT System at Chan Sow Lin Bridge, Kuala Lumpur
Aug. ‘96 – Present
Director – Operations
Serrig Sdn. Bhd. / Ecotegas Sdn. Bhd.
Over 30 years of working experience in land survey and construction works.
Responsible for management and operations of various construction projects:
- Caissons and cofferdam works for Westin Hotel at Jln. Bukit Bintang, Kuala Lumpur
- Guniting works for the tower base and slope surface protection for the 275KV
Bintulu-Miri T/L project, Sarawak - Caissons and associated works for Billion Court Condominiums, Genting Highlands
- Rock bolt for the proposed Berjaya Star City, Jln. Imbi, Kuala Lumpur
- Maintenance of soil anchors at Slope A3, KM28.5EB, Kuala Lumpur-Karak Highway
- Installation of rockfall netting at Genting Sempah, Kuala Lumpur-Karak Highway
- Guniting works for Main & Inverted Domes at International Islamic Arts Museum,KL
- Guniting & soil nailing for the Pos Selim – Kg. Raja Highway, Cameron Highland
- Pressured grouting and structural repair works for Skudai Parade, Skudai, Johor
- Caissons works for KL-Putrajaya Dedicated Highway and Duta-Ulu Kelang
Expressway (DUKE) projects in Kuala Lumpur - Secant micropiles for Sg. Klang Offtake, SMART project , Kg. Berembang, KL
- Caissons works for Penchala Link elevated rapms at Mutiara Damansara, PJ
- Caissons & guniting works at Four Seasons Hotel, Jalan Lumba Kuda, KL
- Caissons & micropiles for Klang Valley Mass Rapid Transit (KVMRT) projects
Competency : Authorised Gas Tester & Entry Supervisor for confined space (JKKP)