Skip to content
Home » HOW POOI HAN

HOW POOI HAN

Name                      : HOW POOI HAN
Date of Birth         : November 23, 1959
Present Position : Director – Operations

EXPERIENCE :

Mar. ‘83 – Jun. ‘91
Surveyor
Pilecon Engineering Sdn. Bhd.

Responsible for setting out and as built surveys for various driven piles, bored
piles, caissons, micropiles, ground anchors, and diaphragm walls construction
projects.

July ‘91 – Aug. ‘95
Executive Supervisor cum Surveyor
Bachy Soletanche (M) Sdn. Bhd.

Surveyed and supervised various construction projects including:

  • Diaphragm wall, anchors, and micropiling works at Jln. Sultan for UDA, K.L.
  • Ground anchors and pressure grouting works at Wisma Genting, K.L.
  • Anchored caissons retaining walls for Resort Hotel & Car Park 4, Genting Highlands
  • Micropiling works for Outdoor Theme Park project in Genting Highlands
  • Caissons foundation for RSC 5 Staff Quarters, Genting Highlands
  • Caissons foundation for the new Sewerage Treatment Plant, Genting Highlands
  • Underpinning works for Cable Car Tower 4, Genting Highlands
  • Pressure grouting works at RSC 2 Staff Quarters, Car Park 1, Genting Road 4.1KM
    and 4.9KM, Pump House 1, 2 and 3, Valley Wing Hotel, Theme Park Hotel, Chin
    Swee Temple, etc. for Resorts World Bhd. at Genting Highlands

 

Sep. 95 – Jul. ‘96
Director
Alpha Geotechnique Sdn. Bhd

Coordinated and managed the following construction projects:

  • Caissons, bored piles and gunite wall for Menara Lagenda, Kuala Lumpur
  • Slope Remedial works at Villa Genting Amber Court Apartment, Genting Highlands
  • Piling works for the Gohtong Jaya Apartments at Genting Highlands
  • Slope remedial works at CH27.200, Jalan Gunung Raya, Pulau Langkawi, Kedah
  • Caissons, pilecaps, and plinths for Skyway Cable Car System, Genting Highlands
  • Caisson foundation for STAR LRT System at Chan Sow Lin Bridge, Kuala Lumpur

 

Aug. ‘96 – Present
Director – Operations

Serrig Sdn. Bhd. / Ecotegas Sdn. Bhd.

Over 30 years of working experience in land survey and construction works.

Responsible for management and operations of various construction projects:

  • Caissons and cofferdam works for Westin Hotel at Jln. Bukit Bintang, Kuala Lumpur
  • Guniting works for the tower base and slope surface protection for the 275KV
    Bintulu-Miri T/L project, Sarawak
  • Caissons and associated works for Billion Court Condominiums, Genting Highlands
  • Rock bolt for the proposed Berjaya Star City, Jln. Imbi, Kuala Lumpur
  • Maintenance of soil anchors at Slope A3, KM28.5EB, Kuala Lumpur-Karak Highway
  • Installation of rockfall netting at Genting Sempah, Kuala Lumpur-Karak Highway
  • Guniting works for Main & Inverted Domes at International Islamic Arts Museum,KL
  • Guniting & soil nailing for the Pos Selim – Kg. Raja Highway, Cameron Highland
  • Pressured grouting and structural repair works for Skudai Parade, Skudai, Johor
  • Caissons works for KL-Putrajaya Dedicated Highway and Duta-Ulu Kelang
    Expressway (DUKE) projects in Kuala Lumpur
  • Secant micropiles for Sg. Klang Offtake, SMART project , Kg. Berembang, KL
  • Caissons works for Penchala Link elevated rapms at Mutiara Damansara, PJ
  • Caissons & guniting works at Four Seasons Hotel, Jalan Lumba Kuda, KL
  • Caissons & micropiles for Klang Valley Mass Rapid Transit (KVMRT) projects



Competency : Authorised Gas Tester & Entry Supervisor for confined space (JKKP)