Name : NG CHIEW YEONG
Date of Birth : November 4, 1985
Present Position : Construction Manager
EXPERIENCE :
Jul ‘08 – Jan ‘13
Site Supervisor
Serrig Sdn. Bhd.
Supervised varies hand-dug caissons and slope stabilisation works.
- Caissons for Seremban Middle Ring Road project, Seremban, Negeri Sembilan
- Caissons for slope remedial works at Bukit Antarabangsa, Ulu Kelang, Selangor
- Caisson Works for Metropolitan Square at Damansara Perdana, PJ, Selangor
- Caisson works at Mobil petrol station, Lebuh Bandar Utama, Selangor
- Horizontal drain for East Coast Expressway Phase 2, Pahang- Trengganu
- Caisson works for South Quay (RC3) on Lot PT 917, Bandar Sunway, Selangor
- Caisson works for office block on Lot 42, Bandar Sunway, Selangor
- Caisson works for South Quay (RC5) on Lot PT 62658, Bandar Sunway, Selangor
- Caisson works for Sunway Pyramid 3, Bandar Sunway, Selangor
- Caisson works for “Nucleus’project : Penchala Interchange, at Mutiara Damansara, PJ
Feb ‘13 – Dec ‘ 16
Executive Supervisor
Serrig Sdn. Bhd. / Ecotegas Sdn. Bhd.
Supervised and executed caissons, micropiles and slope stabilization works.
projects :
- Caisson works for MRT Package V4, from Section 17, PJ to Semantan Portal, KL
- Caisson works for MRT Package V7, from Tmn Tun Hussien Onn to Tmn Mesra, Cheras
- Caisson works for Sg. Buloh & Kuang Interchange for PLUS Highway 4th lane widening
- Caisson works for Four Seasons Hotel at Jalan Lumba Kuda, Kuala Lumpur
- Cement grouting for sonic logging pipes in bored pile for LRT Kelana Jaya Line extension
- Caisson works for South Quay (CP3) on Lot PT 62637, Bandar Sunway, Selangor
- Caisson works for proposed development at LRT Dang Wangi Station, Kuala Lumpur
- Soil nailing works for MRT Package V4 from Section 17, PJ to Semantan Portal, KL
- Micropile and caisson works for elevated ramps from MEX to Jln. Cochrane, KL
- Micropile works at Jalan Bukit Segar 9, Taman Segar, Cheras, Kuala Lumpur
- Caisson works for Genting Premium outlet Mall, Genting Highlands, Pahang
- Caisson works for elevated interchange and tunnel from Lebuhraya Puchong-Sg. Besi to
Taman LTAT Bukit Jalil, KL - Caisson works for swimming pool at Jalan Bistari 5, Bukit Damansra, Kuala Lumpur
Jan ‘17 – Present
Construction Manager
Serrig Sdn. Bhd. / Ecotegas Sdn. Bhd.
Involved in the operation, supervision and execution of various projects:
- Caisson works for SUKE (CB1), Section B – Cheras to Ulu Kelang
- Caisson & micropiling works for DASH (CB1,CB2,CB3)
- Caisson works for construction of jacking and receiving pits at Sungai Langat, Kajang
- Caisson works for construction of jacking and receiving pits at Bunus, Kuala Lumpur
- Caisson works for construction of jacking and receiving pits at Belfield, Kuala Lumpur
- Rock excavation works for construction of manhole shaft at Bunus, Kuala Lumpur
- Rock excavation works for construction of manhole shaft at Ipoh, Perak (PAPAN 1)
- Caisson works for addition and alteration works for MRT 2 at LRT Chan Sow Lin
- Caisson works for pier construction at LRT 3 (Package GS07-08)
Competency : Authorised Entrant and Standby Person for Confined Space (NIOSH)